|
|
600c67b3aa
|
Add architecture decisions log
Finalized infrastructure role assignments:
- Command Center: Pure Frostwall Gateway
- TX1 Dallas: Management Hub (Phase 0.5 target)
- NC1 Charlotte: Pure game workload
- Ghost VPS: Marketing + flex capacity (keeping)
- ATM10 Java heap fix documented
Decision made 2026-02-08 after full capacity analysis.
|
2026-02-08 16:07:26 -06:00 |
|