Chronicler
|
801f275fa2
|
docs: Complete Firefrost Codex Phase 1 deployment documentation
- Add comprehensive deployment summary (DEPLOYMENT-COMPLETE.md)
- Full technical architecture and configuration
- Complete deployment timeline with challenges
- Performance benchmarks and cost analysis
- Security considerations and known issues
- Maintenance procedures and troubleshooting
- ~6,000 lines of detailed documentation
- Add Phase 2 next steps guide (NEXT-STEPS.md)
- Workspace creation procedures
- Git sync script specification
- Security hardening checklist
- User account management
- Complete verification procedures
Phase 1 Status: COMPLETE ✅
- AnythingLLM + Ollama deployed on TX1
- 5 models downloaded (73.5 GB)
- qwen2.5-coder:7b selected for production (5-10 sec responses)
- Multi-user mode enabled
- $0/month additional cost
- Ready for Phase 2 content population
Deployment completed after 9 hours with full networking troubleshooting.
All services operational and performance validated.
Fire + Frost + Foundation + Codex = Where Love Builds Legacy 💙🔥❄️🤖
|
2026-02-20 20:24:31 +00:00 |
|