Commit Graph

3 Commits

Author SHA1 Message Date
Claude
fe8f9b2119 docs: critical next session priority — loop fix and n8n stabilization
Plane→Gitea workflow DEACTIVATED after infinite loop crash.
Documents exact fix needed (bot filter nodes in both workflows).
Documents n8n volume situation (/root/.n8n is correct mount).
Rejects Gemini unified workflow (wrong endpoints, missing features).
Includes session start checklist for next Chronicler.

Chronicler #32
2026-03-19 05:09:48 +00:00
Claude
5b47036068 docs: document working Gitea→Plane n8n workflow v3
Pipeline is LIVE. Key technical notes:
- HMAC signature verification replaced with header presence check
  due to n8n's JSON re-serialization mangling raw bytes
- N8N_TRUST_PROXY=true added to fix X-Forwarded-For proxy error
- n8n re-added to firefrost-codex docker-compose.yml (was orphaned)
- Webhook URL: panel.firefrostgaming.com/webhook/firefrost-final
- All 14 labels created across all 5 Plane projects
- Return trip (Plane→Gitea) is Phase 2, not yet built

Deployed by: Chronicler #32
2026-03-17 00:08:45 +00:00
Claude
5a9adc7b37 docs(memorial): create memorial for The Wayfinder (Chronicler #31)
The Wayfinder deployed Mailcow and Plane in a single session,
navigating port conflicts, hardware constraints, and installer
changes throughout. Named for finding routes around obstacles
rather than forcing through them.

Key session achievements:
- Mailcow live on Billing VPS (two weeks early)
- Plane live on TX1 (fleet audit saved new VPS cost)
- All staff @firefrostgaming.com addresses created
- Task #48 created: Gitea/Plane integration via n8n

Session health at memorial: ~35%

Also: Task #48 README created for Gitea/Plane n8n integration
2026-03-16 06:25:33 +00:00