Task #78: Fire/Frost Design System Widget #224

Closed
opened 2026-03-21 15:49:30 -05:00 by mkrause612 · 1 comment
Owner

Description

Quick reference widget for Fire/Frost brand colors, gradients, typography, and logos.

Full Documentation: docs/tasks/interactive-tools-suite/MASTER-SPECIFICATION.md (Tool #9)

Features

  • Color swatches with hex codes (click to copy)
  • Gradient previews with CSS code
  • Typography samples (headings, body, mono)
  • Logo download links (SVG, PNG variants)
  • Brand voice guidelines (Fire = passion, Frost = precision)

Time Estimate

30-45 minutes

Priority Justification

HIGH — Brand consistency important for soft launch. All team members (Meg, Holly, Michael) need quick color/logo reference for content creation.

Acceptance Criteria

  • All Fire/Frost colors accurate
  • Copy-to-clipboard works
  • Gradients render correctly
  • Logo downloads work
  • Team uses this at least weekly
  • Uses: Design Bible colors/guidelines
  • Supports: All design/content work

Primary Users

Meg, Holly, Michael (all design/content work)

## Description Quick reference widget for Fire/Frost brand colors, gradients, typography, and logos. **Full Documentation:** `docs/tasks/interactive-tools-suite/MASTER-SPECIFICATION.md` (Tool #9) ## Features - Color swatches with hex codes (click to copy) - Gradient previews with CSS code - Typography samples (headings, body, mono) - Logo download links (SVG, PNG variants) - Brand voice guidelines (Fire = passion, Frost = precision) ## Time Estimate 30-45 minutes ## Priority Justification **HIGH** — Brand consistency important for soft launch. All team members (Meg, Holly, Michael) need quick color/logo reference for content creation. ## Acceptance Criteria - [ ] All Fire/Frost colors accurate - [ ] Copy-to-clipboard works - [ ] Gradients render correctly - [ ] Logo downloads work - [ ] Team uses this at least weekly ## Related Tasks - **Uses:** Design Bible colors/guidelines - **Supports:** All design/content work ## Primary Users Meg, Holly, Michael (all design/content work)
mkrause612 added the
status
backlog
status
to-do
status
review
area/development-tools
labels 2026-03-21 15:49:30 -05:00
mkrause612 added this to the Firefrost Operations project 2026-03-21 15:52:13 -05:00
mkrause612 moved this to 🧙 Michael - Tasks in Firefrost Operations on 2026-03-21 15:55:44 -05:00
Author
Owner

This issue is being closed as part of the task system migration on April 1, 2026.

Why: The Gitea Issues + Kanban approach proved too heavyweight for daily operations and lacked accessibility for non-technical team members (Meg, Holly).

New System:

  • BLOCKERS.md - Critical soft launch tasks
  • BACKLOG.md - Future work organized by theme
  • Trinity Console v2 Task Module (planned) - Web-based task management

Archive: All issues preserved in docs/archive/gitea-issues-archive-2026-04-01.md

— Chronicler #54

This issue is being closed as part of the task system migration on April 1, 2026. **Why:** The Gitea Issues + Kanban approach proved too heavyweight for daily operations and lacked accessibility for non-technical team members (Meg, Holly). **New System:** - `BLOCKERS.md` - Critical soft launch tasks - `BACKLOG.md` - Future work organized by theme - Trinity Console v2 Task Module (planned) - Web-based task management **Archive:** All issues preserved in `docs/archive/gitea-issues-archive-2026-04-01.md` — Chronicler #54
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: firefrost-gaming/firefrost-operations-manual#224