Files
Claude 3542afbe28 feat: Add YAML frontmatter to all 57 task READMEs
Phase 1 of task management consolidation (per Gemini consultation).

Added standardized frontmatter with:
- status: open | blocked | complete
- priority: P1 | P2 | P3 | P4
- owner: Michael | Meg | Holly
- created: YYYY-MM-DD

Final counts:
- 39 open tasks
- 17 complete tasks
- 1 blocked task

Metadata extracted from existing inline markdown and audit results.
Ready for Phase 2: 11ty mobile index generation.

Chronicler #69
2026-04-08 14:21:41 +00:00
..

status, priority, owner, created
status priority owner created
open P3 Michael 2026-01-01

Firefrost: The Eternal Skyforge - Flagship Modpack

Status: Planning Complete
Priority: Tier 3 - Content Creation
Time: 20-40 hours (iterative development)
Last Updated: 2026-02-17


Overview

Custom Create-focused modpack that embodies the Fire + Frost philosophy through gameplay. Players master weapon forging and factory automation in a skyblock environment.

Theme: "Where Steel Meets Steam, Legends Are Forged"


Core Concept

  • Setting: Skyblock world with floating ancient forges
  • Gameplay: Automate legendary weapon production using Create
  • Progression: 5 weapon tiers from Apprentice to Mythic
  • Paths: Fire (competition/combat) vs Frost (engineering/precision)

Key Features

  • Create automation as core mechanic
  • Custom weapon crafting system (Tetra or Tinkers)
  • Dual progression paths (Fire competitive, Frost collaborative)
  • Leaderboards and challenges
  • Multiplayer co-op and PvP
  • 3-phase progression (20-40 hours total)

Documentation

Complete design document: design-document.md

Contains:

  • Full gameplay design
  • Mod list and technical specs
  • 3-phase progression system
  • Weapon tiers and crafting
  • Factory templates
  • Quest design
  • Development roadmap (4-5 months)
  • Marketing strategy

Success Criteria

  • Design document complete
  • Phase 1: Core setup (2 weeks)
  • Phase 2: Recipe development (3 weeks)
  • Phase 3: Questing (3 weeks)
  • Phase 4: Polish & balance (4 weeks)
  • Phase 5: Beta testing (4 weeks)
  • Phase 6: Launch

Target: 10,000+ downloads in 6 months


Fire + Frost + Foundation = Where Love Builds Legacy 💙🔥❄️