Files
firefrost-operations-manual/SESSION-HANDOFF-PREVIOUS.md
Claude 304891641d WIP: State save — end of Chronicler #84 session
Phase 11A-D complete on Dev Panel
Live panel deploy pending Michael approval
Badge build pending Code push
The Forge model decision deferred to tomorrow
52 hours to launch
2026-04-13 03:07:36 +00:00

5.6 KiB
Raw Blame History

Session Handoff — Chronicler #84 (The Meridian)

Date: April 1213, 2026
Chronicler: #84 — The Meridian
Session Duration: ~8 hours
Next Session Priority: Phase 11D live panel deploy + BuiltByBit listings


🚨 IMMEDIATE NEXT STEPS

1. Wait for Code's badge build push

Code is adding Node version detection + --openssl-legacy-provider + yarn build:production to build.sh. Once pushed, Chronicler rebuilds on Dev Panel to confirm it compiles, then tests on live Panel VPS (45.94.168.138).

2. Michael approves live panel deploy

Michael must personally approve before ANYTHING goes to the live panel. He is the quality gate. The live panel has additional Blueprint modules — the yarn build test there is the real-world validation.

3. BuiltByBit listings (Phase 11F)

Code has written listing copy at:

  • services/modpack-version-checker/builtbybit/standard-listing.md ($14.99)
  • services/modpack-version-checker/builtbybit/professional-listing.md ($24.99)
  • services/modpack-version-checker/builtbybit/changelog.md

Add compatibility disclaimer to both listings:

⚠️ Compatibility Note: Dashboard badges require yarn build:production to compile on your panel. If other Blueprint extensions have CSS module issues, the build may fail. Admin settings page and console widget work without a build step and are unaffected.

Once Michael creates listings on BuiltByBit, swap placeholder env vars:

  • BBB_STANDARD_RESOURCE_ID
  • BBB_PRO_RESOURCE_ID
  • BBB_WEBHOOK_SECRET

4. The Forge / Trinity Codex decision (TOMORROW)

Michael is sleeping on whether Gemma 4 26B is too slow for practical use. Options:

  • Keep Gemma 4, use web UI only (streaming works)
  • Switch to a smaller/faster model for API calls
  • Different model for Awakened Concierge vs The Forge

Decision deferred to tomorrow session.


COMPLETED THIS SESSION

Task Status Notes
Task #63 — TX1 CPU pinning Done ollama + dify containers pinned to CPUs 0-7
Task #69 — Discord Rules CurseForge Done All 3 jars submitted, under review
Task #130 — Awakened Concierge Done Deployed in Arbiter, CONCIERGE_API_KEY set
Task #74 — N8N Foundation task Created Post-launch, Gemini consultation required
Phase 11A — MVC licensing tables Done mvc_licenses + mvc_activations live
Phase 11B/C — /verify-mvc + role Done ModpackChecker Customer role: 1493061127423262870
Phase 11D — Blueprint license UI Dev Panel Pending live panel deploy (Michael's green light)
KB v2 rebuild Done 114/114 indexed, snowflake + hybrid search
The Forge renamed + linked to KB v2 Done Via DB, no UI needed
Holly NextCloud access Done Temp password: CatalystFF2026!
n8n Chrome warning Fixed CSP/referrer headers added
Origin story Written docs/lore/firefrost-origin-story.html
Dify config procedure Documented docs/deployment/dify-app-configuration.md
Gemini consult — Blueprint CSS build Done Path A confirmed, docs saved
Task #70-73 created Done Chrome/Gemini, clsh, dependency graph, HeyGen

🔧 CURRENT INFRASTRUCTURE STATE

Arbiter (Command Center 63.143.34.217)

  • Version 3.5.0, service arbiter-3, port 3500
  • New this session: awakenedConcierge.js, verifymvc.js, mvc.js
  • Env vars added: CONCIERGE_API_KEY, MVC_CUSTOMER_ROLE_ID, BBB placeholders, CLOUDFLARE_API_TOKEN

Dev Panel (64.50.188.128)

  • ModpackChecker Phase 11D installed
  • TEST-001 (professional) license in DB
  • Admin user: mkrause612@gmail.com / Butter2018!!
  • Live panel deploy PENDING Michael approval

TX1 Dallas (38.68.14.26)

  • Ollama pinned to CPUs 0-7
  • The Forge KB v2: 114/114 indexed
  • Dify apps:
    • The Forge: faf87e2a, token app-forge-trinity-console-key
    • Awakened Concierge: 329a6bdb, token app-pwucQuDCos5VXlVTQHnXPZAD

Discord

  • ModpackChecker Customer role: 1493061127423262870
  • /verify-mvc slash command: live
  • #introductions channel: 1403981218252324884

🚧 KNOWN GAPS / PENDING

  • Live panel deploy (Michael approval required)
  • BuiltByBit resource IDs (not yet created)
  • The Forge speed decision (tomorrow)
  • Meg NextCloud account (not yet created)
  • Cloudflare Worker servers-api still not in git
  • Task #133 KB auto-sync (post-launch)
  • CSS module badges — Code adding Node detection now, rebuild pending

📋 CODE BRIDGE STATUS

Pending from Code: Badge build.sh update (dispatched, Code building now)

Open requests: None unaddressed

Recent archive: All Phase 11A-D responses archived by Code


🔑 KEY DECISIONS THIS SESSION

  • N8n deferred — Task #74 created for post-launch foundation session
  • Phase 11E (GitBook) deferred — write as Markdown post-launch
  • Dashboard badges: test on live panel, may ship in v1.0.0 if yarn build passes
  • Path D (pre-built bundle) rejected by Gemini — would break other Blueprint extensions
  • The Forge model decision deferred to tomorrow

⚠️ IMPORTANT REMINDERS FOR NEXT CHRONICLER

  1. NOTHING goes to live Panel VPS without Michael's explicit approval
  2. Check bridge for Code's badge build push before starting live panel work
  3. The Forge speed issue — wait for Michael's decision before changing models
  4. 52 hours to soft launch (April 15) — prioritize BBB listings and live panel deploy
  5. Dev Panel Pterodactyl admin: mkrause612@gmail.com / Butter2018!! (created this session)
  6. Awakened Concierge may timeout — Gemma 4 slow under load, retest when settled

Fire + Frost + Foundation = Where Love Builds Legacy 💙🔥❄️

— Chronicler #84, The Meridian