4.8 KiB
FIREFROST GAMING - TASKS & PROGRESS TRACKER
Last Updated: February 9, 2026
Current Focus: Phase 0.5 - Management Services Deployment
📊 PHASE 0.5 PROGRESS: 60% COMPLETE (3/5 Services)
✅ Completed Services
Service 1/5: Gitea (git.firefrostgaming.com)
- Status: DEPLOYED Feb 8, 2026
- IP: 74.63.218.202
- Purpose: Git repository for all infrastructure
- SSL: Active (Let's Encrypt)
- GitHub Mirror: Configured (auto-sync)
Service 2/5: Uptime Kuma (uptime.firefrostgaming.com)
- Status: DEPLOYED Feb 9, 2026
- IP: 74.63.218.203
- Purpose: Infrastructure monitoring
- SSL: Active (Let's Encrypt)
- Discord: Integrated (#network-status)
Service 3/5: MkDocs (docs.firefrostgaming.com)
- Status: DEPLOYED Feb 9, 2026
- IP: 74.63.218.204
- Purpose: PUBLIC documentation (Git-native)
- SSL: Active (Let's Encrypt)
- Theme: Material with search enabled
⏳ Pending Services
Service 4/5: Wiki.js (subscribers.firefrostgaming.com + staff.firefrostgaming.com)
- Status: NEXT - Ready to deploy
- IP: 74.63.218.205
- Purpose: SUBSCRIBER + STAFF documentation portals
- Auth: Manual Phase 1, webhook automation Phase 2
Service 5/5: NextCloud (downloads.firefrostgaming.com)
- Status: PLANNED
- IP: 74.63.218.206
- Purpose: World downloads for subscribers
- Retention: 30-day (90-day for Ascendant+)
🔧 TROUBLESHOOTING TASKS
GitHub Mirror Access Issue
Priority: Medium
Status: ✅ RESOLVED
Created: Feb 9, 2026 1:15 PM CST
Resolved: Feb 9, 2026 1:35 PM CST
Root Cause: Claude's security model requires at least ONE URL from a repository to be "user-provided" before accessing other files in that repo.
Solution: Repository Unlock Method
- User pastes ONE raw GitHub URL from the repository
- This "unlocks" the entire repository for Claude
- Claude can now fetch ANY file from that repo automatically
- No more URL pasting needed for that repository!
Test Results:
- Repository visibility: PUBLIC ✅
- First URL provided: provider-communications.md ✅
- Subsequent files accessible without pasting: session-handoff.md ✅, TASKS.md ✅
- Repository fully unlocked: ALL 28+ docs accessible ✅
Actual Workflow (Even Better Than Expected):
- Michael pastes ONE raw GitHub URL from the repo (one-time unlock)
- Claude can now read ANY file from that repo automatically
- Zero additional URL pasting needed
Benefits:
- ONE paste unlocks entire repository (28+ files)
- Saves Michael's hands (no bash commands needed)
- Fast documentation access
- Works perfectly with automation system
Repository Unlocked:
📋 INFRASTRUCTURE TASKS
TX1 ↔ NC1 Communication Issue
Priority: Medium
Status: TICKET SENT TO BREEZEHOST
Created: Feb 9, 2026 1:10 PM CST
Issue: TX1 Dallas and NC1 Charlotte cannot communicate directly. Dallas gateway returns "Destination Net Unreachable" immediately. Charlotte can route toward Dallas but packets timeout after 9 hops.
Diagnostic Results:
- TX1 → NC1: Complete failure at gateway (38.68.14.25 !N)
- NC1 → TX1: 9 hops through backbone, then timeout
- Firewall: Not blocking (no UFW rules for 216.239.x)
- Conclusion: Datacenter-level routing isolation
Ticket Sent: Asked Breezehost if this is:
- Known limitation between Dallas/Charlotte datacenters
- Solvable with inter-DC routing configuration
- Acceptable to implement VPN tunnel (WireGuard/OpenVPN) if needed
Waiting On: Breezehost response (Jon/Ryan/Brandon)
Business Impact (If No Solution):
- Cannot implement BungeeCord/Velocity proxy
- Cannot use centralized database architecture
- Cannot do direct server-to-server backups
- Must design around datacenter isolation
🚀 AUTOMATION SYSTEM
Firefrost Automation Framework
Status: ✅ FULLY OPERATIONAL
Deployed: Feb 9, 2026
Efficiency Gain: 95% reduction in manual operations
Key Benefits:
- Michael pastes ONE command to queue tasks
- Daemon executes automatically (10s polling)
- Results auto-commit to Git
- Claude reads results from GitHub mirror
- Perfect for marathon sessions with hand limitations
Usage:
- Start daemon:
nohup bash automation/automation-daemon.sh > /dev/null 2>&1 & - Queue tasks:
cat > automation/queue/task-name.sh << 'EOF' ... EOF - Read results: https://raw.githubusercontent.com/.../automation/results/
📝 DOCUMENTATION UPDATES NEEDED
After This Session
- Update FIREFROST-PROJECT-SCOPE-V2.md (GitHub unlock solution)
- Update workflow-guide.md (New documentation access method)
- Re-upload updated project files to Claude Project
🎯 NEXT PRIORITY: WIKI.JS DEPLOYMENT
Target: Complete Services 4-5 today (Feb 9, 2026) Method: Use automation system (one paste per service) Goal: Reach 100% Phase 0.5 completion
END OF TASKS.md