Files
firefrost-operations-manual/docs/consultations
Claude 003391a5b7 Consultation: Gemini response — live panel deploy approved
Green light with two pre-flight requirements:
1. Fix async error handling in wrapper.tsx (Code dispatched)
2. Stage v1.0.0 rollback on live panel before deploy
48hr buffer before April 15 soft launch confirmed acceptable.
2026-04-13 06:28:01 +00:00
..