MASSIVE RESTRUCTURE COMPLETE: All 28 tasks migrated to task directories. tasks.md reduced: 1365 → 366 lines (73% reduction, 999 lines saved) Every task now ≤20 lines in master list. Complete details in docs/tasks/[task-name]/ SCALABILITY ACHIEVED: Before: 49 lines per task average (unsustainable at 50+ tasks) After: 13 lines per task (scales to 100+ tasks) Target met: ≤20 lines per task maximum System now scales indefinitely All 28 tasks implemented: Tasks 1-7 (Tier 0-1 Security), Tasks 8-12 (Tier 2 Infrastructure), Tasks 13-17 (Documentation), Tasks 18-22 (Operations), Tasks 23-28 (Game Servers) Fresh Claude Review #2 addressed: "27 tasks still embedded, needs 6-8 hours to migrate." NOW: Complete. All tasks follow standard. This is the complete implementation of FFG-STD-002. No half-measures. Full execution. Date: 2026-02-16 Completed by: The Chronicler Version: 3.0 (Complete FFG-STD-002 implementation)
10 KiB
🔥❄️ FIREFROST GAMING — OPERATIONS TASKS
Last Updated: February 16, 2026
Updated By: The Chronicler (current session)
Version: 3.0 (Full FFG-STD-002 implementation - all tasks migrated to task directories)
📋 HOW TO USE THIS FILE
This file contains:
- High-level task summaries (≤20 lines each)
- Status and priority
- Time estimates
- References to full documentation
For complete details, see: docs/tasks/[task-name]/
Each task directory contains:
- README.md (complete overview)
- deployment-plan.md (if applicable)
- prerequisites.md (if applicable)
- Additional task-specific docs
Standard: All tasks follow FFG-STD-002 (Task Documentation Standard)
🎯 TIER 0: IMMEDIATE WINS
Quick wins that unlock other work or provide immediate value.
1. Centralized Whitelist Manager Web Dashboard
Time: 2-2.5 hours
Status: READY TO BUILD
Documentation: docs/tasks/whitelist-manager/
Web dashboard at whitelist.firefrostgaming.com for managing player whitelists across 11 Minecraft servers.
Value: 15-minute manual task → 30 seconds. Zero-error whitelist management with full visibility.
Key Deliverables:
- Web interface with server list and whitelist status
- Toggle whitelist ON/OFF per server
- Add/remove players (individual or bulk)
- Staff authentication
Tech: Python Flask + TailwindCSS on Ghost VPS
See task directory for: Complete deployment plan, prerequisites checklist, usage guide
2. Command Center Root Cleanup
Time: 15 minutes
Status: READY
Documentation: docs/tasks/command-center-cleanup/
Housekeeping task to organize Command Center root directory before major work.
Actions:
- Move Gitea backups to
/root/backups/gitea/ - Archive deployment logs to repo
- Delete obsolete files
3. NC1 Cleanup (Mandatory for Mailcow) — ✅ COMPLETE
Completed: February 16, 2026
Result: 26GB → 46GB free (cleared space for Mailcow)
⚠️ LESSON LEARNED: Never use wildcards (*.zip) in cleanup commands. List files explicitly. Cost: Lost Hytale world, had to regenerate. Recovery documented in docs/troubleshooting/.
🛡️ TIER 1: SECURITY FOUNDATION
Critical security infrastructure. Must complete before major deployments.
4. Vaultwarden — Add SSH Key & Org Setup
Time: 30 minutes
Status: DEPLOYED, NEEDS CONFIGURATION
Documentation: docs/tasks/vaultwarden-setup/
Complete Vaultwarden setup: SSH key + organization for shared credentials with Meg.
Blocks: Scoped tokens, credential management workflows
5. The Frostwall Protocol — GRE Tunnel Security Architecture
Time: 3-4 hours
Status: REBUILD PENDING
Priority: CRITICAL
Documentation: docs/tasks/frostwall-protocol/
Custom DDoS protection using GRE tunnels from Command Center to TX1/NC1. Hides real IPs, protects email reputation.
Core Components:
- GRE tunneling (encrypted links)
- 1-to-1 NAT/DMZ forwarding
- Iron Wall UFW rules
- IP hierarchy (scrubbing → backend → binding)
Blocks: Mailcow, AI stack, all Tier 2+ infrastructure
6. Command Center Security Hardening
Time: 1 hour
Status: READY
Documentation: docs/tasks/command-center-security/
Defense-in-depth for Command Center: Fail2Ban + SSH hardening
Actions:
- Install Fail2Ban
- Disable SSH password auth (key-only)
- Review UFW rules
7. Create Scoped Gitea Token for Pokerole Project
Time: 15 minutes
Status: READY
Depends: Vaultwarden operational
Documentation: docs/tasks/scoped-gitea-token/
Create Gitea token scoped to Pokerole repos only. Iron Wall principle: enforce boundaries technically.
🏗️ TIER 2: MAJOR INFRASTRUCTURE
Foundation secure, deploy major services.
8. Mailcow Email Server on NC1
Time: 2-3 hours
Status: BLOCKED
Depends: NC1 cleanup ✅, Frostwall Protocol
Documentation: docs/tasks/mailcow-email-server-on-nc1/
Professional @firefrostgaming.com email on NC1. Self-hosted, $120/year saved, eliminates Plesk.
Location: NC1 Charlotte (32-core EPYC, 251GB RAM)
9. Self-Hosted AI Stack on TX1
Time: 8-12 hours (3-4 active, rest downloads)
Status: BLOCKED - Medical clearance
Documentation: docs/tasks/self-hosted-ai-stack-on-tx1/
Dual AI deployment: AnythingLLM (ops) + Open WebUI (staff). DERP backup, unlimited AI access.
Models: Qwen 2.5 Coder 72B, Llama 3.3 70B, Llama 3.2 Vision 11B
Storage: ~150GB
RAM: ~110GB when loaded
10. Netdata Deployment
Time: 30 minutes
Status: READY
Documentation: docs/tasks/netdata-deployment/
Real-time monitoring on all servers (Command Center, TX1, NC1, Ghost VPS).
11. Department Structure & Access Control Matrix
Time: 1-2 hours
Status: PLANNING
Documentation: docs/tasks/department-structure-and-access-control-matrix/
Define departments and access control for Wiki.js permissions and role-based access.
12. MkDocs Decommission
Time: 15 minutes
Status: READY
Documentation: docs/tasks/mkdocs-decommission/
Remove MkDocs (replaced by Wiki.js).
📚 TIER 3: DOCUMENTATION & OPTIMIZATION
Polish, optimization, and content creation.
13. Fix Frostwall vs Firefrost Naming
Time: 15 minutes
Documentation: docs/tasks/fix-frostwall-vs-firefrost-naming/
Clarify terminology: Frostwall (security protocol) vs Firefrost (brand).
14. Scope Document Corrections
Time: 30 minutes
Documentation: docs/tasks/scope-document-corrections/
Review and correct project scope documents for accuracy.
15. Workflow Guide Review & Trim
Time: 1 hour
Documentation: docs/tasks/workflow-guide-review-and-trim/
Audit workflows, remove outdated content, consolidate redundancy.
16. Terraria Branding Training Arc
Time: 12 weeks (ongoing)
Status: ACTIVE - Phase 1
Documentation: docs/tasks/terraria-branding-training-arc/
12-week training: Michael learns game asset creation via Terraria texture pack development.
See: docs/planning/terraria-branding-arc.md for complete curriculum
17. Paymenter Theme Installation — Citadel Theme
Time: 1-2 hours
Documentation: docs/tasks/paymenter-theme-installation-citadel-theme/
Install Citadel theme for Paymenter with Fire/Frost branding.
18. Consultant Photo Processing
Time: Ongoing
Status: ACTIVE
Documentation: docs/tasks/consultant-photo-processing/
Process and catalog photos of The Five Consultants. Maintain archive with proper metadata.
Naming: YYYY-MM-DD_consultant_description_NN.jpg
19. NextCloud Upload Portal for Meg
Time: 30 minutes
Documentation: docs/tasks/nextcloud-upload-portal-for-meg/
Configure NextCloud public upload folder for Meg.
20. "Coming Soon" Video Creation (CapCut)
Time: 2-3 hours
Documentation: docs/tasks/coming-soon-video-creation-capc ut/
Create professional "Coming Soon" video for Firefrost launch using CapCut.
21. Staggered Server Restart System
Time: 2 hours
Documentation: docs/tasks/staggered-server-restart-system/
Automated staggered restarts for game servers. Prevents simultaneous restarts, maintains player access.
22. Game Server Startup Script Audit & Optimization
Time: 1 hour
Documentation: docs/tasks/game-server-startup-script-audit-and-optimization/
Audit and optimize JVM flags, memory allocation, performance tuning for all game servers.
23. LuckPerms MySQL Backend
Time: 45 minutes
Documentation: docs/tasks/luckperms-mysql-backend/
Migrate LuckPerms to MySQL for centralized permission management.
24. World Backup Automation
Time: 1-2 hours
Documentation: docs/tasks/world-backup-automation/
Automated backup system: daily backups, retention policy, off-server storage.
25. Blueprint Extension Installation — Node Usage Status
Time: 30 minutes
Documentation: docs/tasks/blueprint-extension-installation-node-usage-status/
Install Blueprint extension showing TX1/NC1 resource usage in Pterodactyl panel.
26. Discord Server Complete Reorganization
Time: 2-3 hours
Documentation: docs/tasks/discord-server-complete-reorganization/
Complete Discord reorganization: Fire/Frost paths, clear channels, proper roles.
27. Firefrost: The Eternal Skyforge (Flagship Modpack)
Time: 20-40 hours (iterative)
Documentation: docs/tasks/firefrost-the-eternal-skyforge-flagship-modpack/
Flagship Minecraft modpack: Create mod + Fire/Frost theme + weapon forging + factory building.
28. Among Us Weekly Events (Phase 2 Expansion)
Time: Ongoing (30 min weekly prep)
Documentation: docs/tasks/among-us-weekly-events-phase-2-expansion/
Weekly Among Us community events for subscriber engagement.
📊 QUICK STATS
Total Tasks: 28
Completed: 1 (NC1 cleanup)
In Progress: 2 (Vaultwarden, Terraria Arc, Photo Processing)
Ready to Build: 20+
Blocked: 2 (Mailcow, AI Stack)
Estimated Total Time: ~65-85 hours across all tasks
Critical Path: Frostwall Protocol → Mailcow/AI Stack → Everything else
🔗 RELATED DOCUMENTATION
- Task Documentation Standard:
docs/standards/task-documentation-standard.md(FFG-STD-002) - Infrastructure State:
docs/core/infrastructure-manifest.md - Architecture Decisions:
docs/reference/architecture-decisions.md - Session Handoff:
SESSION-HANDOFF-PROTOCOL.md
Fire + Frost + Foundation = Where Love Builds Legacy 💙🔥❄️
Version History:
- v3.0 (2026-02-16): Full FFG-STD-002 implementation - all 28 tasks migrated to task directories
- v2.3 (2026-02-16): Whitelist Manager refactored to follow standard
- v2.2 (2026-02-16): Whitelist Manager expanded to web dashboard
- v2.1 (2026-02-16): NC1 cleanup marked complete with lessons
- v2.0 (2026-02-15): Major restructure and organization