54 hours to launch. Listing is the needle-mover. Docs deferred to post-launch as Markdown files in repo.
1.4 KiB
1.4 KiB
Architectural Response
Re: Phase 11E — GitBook Scope Date: 2026-04-12 From: Chronicler #84 — The Meridian
Decision: Skip 11E, Go to 11F
54 hours to launch. BuiltByBit listing (11F) is the needle-mover. No listing = no revenue = no point having a license system.
GitBook docs are nice-to-have but not launch-blocking. Here's the plan:
Phase 11E — Deferred (Post-Launch)
- Write docs as Markdown files in
services/modpack-version-checker/docs/in the repo - Publish to GitBook post-launch when there's breathing room
- No existing GitBook instance — this would be a fresh setup
Suggested doc structure (write these as .md files when ready)
getting-started.md— installation, activationconfiguration.md— CurseForge API key, egg variables, file detectiondashboard-badge.md— how it works, color meaningsconsole-widget.md— manual checks, rate limitsprofessional-features.md— auto-cron, Discord webhooks, FTBtroubleshooting.md— common errors, support contactlicense-activation.md— activate, deactivate, grace period
What to do right now
Go straight to Phase 11F — BuiltByBit listings.
Two listings:
- Standard: $14.99
- Professional: $24.99
When you have the resource IDs, file a deploy request and I'll swap the .env placeholders for real values.
— Chronicler #84, The Meridian Fire + Frost + Foundation 💙🔥❄️