Files
firefrost-operations-manual/docs/core/tasks.md
The Chronicler 1dd41ff6f7 Add Task #29: Staff Recruitment Launch (Guardian's notes)
Reflects The Guardian's prerequisites from discord-recruitment-ad.md:
1. Provision incentive instances (private servers for recruits)
2. Define application review process
3. Finalize recruitment ad decisions

Task captures:
- Recruitment for 2-3 Builders + 1 Social Media Helper
- Prerequisites checklist from Guardian's bottom notes
- Reference to recruitment ad in docs/planning/
- Application process and onboarding workflow

Status: PLANNING (need to provision incentive instances first)
Priority: Tier 3 - Content & Community

Files added:
- docs/tasks/staff-recruitment-launch/README.md
- Updated docs/core/tasks.md (v3.1, Task #29, total 29 tasks)
2026-02-16 14:23:34 +00:00

11 KiB

🔥❄️ FIREFROST GAMING — OPERATIONS TASKS

Last Updated: February 16, 2026
Updated By: The Chronicler (current session)
Version: 3.0 (Full FFG-STD-002 implementation - all tasks migrated to task directories)


📋 HOW TO USE THIS FILE

This file contains:

  • High-level task summaries (≤20 lines each)
  • Status and priority
  • Time estimates
  • References to full documentation

For complete details, see: docs/tasks/[task-name]/

Each task directory contains:

  • README.md (complete overview)
  • deployment-plan.md (if applicable)
  • prerequisites.md (if applicable)
  • Additional task-specific docs

Standard: All tasks follow FFG-STD-002 (Task Documentation Standard)


🎯 TIER 0: IMMEDIATE WINS

Quick wins that unlock other work or provide immediate value.


1. Centralized Whitelist Manager Web Dashboard

Time: 2-2.5 hours
Status: READY TO BUILD
Documentation: docs/tasks/whitelist-manager/

Web dashboard at whitelist.firefrostgaming.com for managing player whitelists across 11 Minecraft servers.

Value: 15-minute manual task → 30 seconds. Zero-error whitelist management with full visibility.

Key Deliverables:

  • Web interface with server list and whitelist status
  • Toggle whitelist ON/OFF per server
  • Add/remove players (individual or bulk)
  • Staff authentication

Tech: Python Flask + TailwindCSS on Ghost VPS

See task directory for: Complete deployment plan, prerequisites checklist, usage guide


2. Command Center Root Cleanup

Time: 15 minutes
Status: READY
Documentation: docs/tasks/command-center-cleanup/

Housekeeping task to organize Command Center root directory before major work.

Actions:

  • Move Gitea backups to /root/backups/gitea/
  • Archive deployment logs to repo
  • Delete obsolete files

3. NC1 Cleanup (Mandatory for Mailcow) — COMPLETE

Completed: February 16, 2026
Result: 26GB → 46GB free (cleared space for Mailcow)

⚠️ LESSON LEARNED: Never use wildcards (*.zip) in cleanup commands. List files explicitly. Cost: Lost Hytale world, had to regenerate. Recovery documented in docs/troubleshooting/.


🛡️ TIER 1: SECURITY FOUNDATION

Critical security infrastructure. Must complete before major deployments.


4. Vaultwarden — Add SSH Key & Org Setup

Time: 30 minutes
Status: DEPLOYED, NEEDS CONFIGURATION
Documentation: docs/tasks/vaultwarden-setup/

Complete Vaultwarden setup: SSH key + organization for shared credentials with Meg.

Blocks: Scoped tokens, credential management workflows


5. The Frostwall Protocol — GRE Tunnel Security Architecture

Time: 3-4 hours
Status: REBUILD PENDING
Priority: CRITICAL
Documentation: docs/tasks/frostwall-protocol/

Custom DDoS protection using GRE tunnels from Command Center to TX1/NC1. Hides real IPs, protects email reputation.

Core Components:

  • GRE tunneling (encrypted links)
  • 1-to-1 NAT/DMZ forwarding
  • Iron Wall UFW rules
  • IP hierarchy (scrubbing → backend → binding)

Blocks: Mailcow, AI stack, all Tier 2+ infrastructure


6. Command Center Security Hardening

Time: 1 hour
Status: READY
Documentation: docs/tasks/command-center-security/

Defense-in-depth for Command Center: Fail2Ban + SSH hardening

Actions:

  • Install Fail2Ban
  • Disable SSH password auth (key-only)
  • Review UFW rules

7. Create Scoped Gitea Token for Pokerole Project

Time: 15 minutes
Status: READY
Depends: Vaultwarden operational
Documentation: docs/tasks/scoped-gitea-token/

Create Gitea token scoped to Pokerole repos only. Iron Wall principle: enforce boundaries technically.


🏗️ TIER 2: MAJOR INFRASTRUCTURE

Foundation secure, deploy major services.


8. Mailcow Email Server on NC1

Time: 2-3 hours
Status: BLOCKED
Depends: NC1 cleanup , Frostwall Protocol
Documentation: docs/tasks/mailcow-email-server-on-nc1/

Professional @firefrostgaming.com email on NC1. Self-hosted, $120/year saved, eliminates Plesk.

Location: NC1 Charlotte (32-core EPYC, 251GB RAM)


9. Self-Hosted AI Stack on TX1

Time: 8-12 hours (3-4 active, rest downloads)
Status: BLOCKED - Medical clearance
Documentation: docs/tasks/self-hosted-ai-stack-on-tx1/

Dual AI deployment: AnythingLLM (ops) + Open WebUI (staff). DERP backup, unlimited AI access.

Models: Qwen 2.5 Coder 72B, Llama 3.3 70B, Llama 3.2 Vision 11B
Storage: ~150GB
RAM: ~110GB when loaded


10. Netdata Deployment

Time: 30 minutes
Status: READY
Documentation: docs/tasks/netdata-deployment/

Real-time monitoring on all servers (Command Center, TX1, NC1, Ghost VPS).


11. Department Structure & Access Control Matrix

Time: 1-2 hours
Status: PLANNING
Documentation: docs/tasks/department-structure-and-access-control-matrix/

Define departments and access control for Wiki.js permissions and role-based access.


12. MkDocs Decommission

Time: 15 minutes
Status: READY
Documentation: docs/tasks/mkdocs-decommission/

Remove MkDocs (replaced by Wiki.js).


📚 TIER 3: DOCUMENTATION & OPTIMIZATION

Polish, optimization, and content creation.


13. Fix Frostwall vs Firefrost Naming

Time: 15 minutes
Documentation: docs/tasks/fix-frostwall-vs-firefrost-naming/

Clarify terminology: Frostwall (security protocol) vs Firefrost (brand).


14. Scope Document Corrections

Time: 30 minutes
Documentation: docs/tasks/scope-document-corrections/

Review and correct project scope documents for accuracy.


15. Workflow Guide Review & Trim

Time: 1 hour
Documentation: docs/tasks/workflow-guide-review-and-trim/

Audit workflows, remove outdated content, consolidate redundancy.


16. Terraria Branding Training Arc

Time: 12 weeks (ongoing)
Status: ACTIVE - Phase 1
Documentation: docs/tasks/terraria-branding-training-arc/

12-week training: Michael learns game asset creation via Terraria texture pack development.

See: docs/planning/terraria-branding-arc.md for complete curriculum


17. Paymenter Theme Installation — Citadel Theme

Time: 1-2 hours
Documentation: docs/tasks/paymenter-theme-installation-citadel-theme/

Install Citadel theme for Paymenter with Fire/Frost branding.


18. Consultant Photo Processing

Time: Ongoing
Status: ACTIVE
Documentation: docs/tasks/consultant-photo-processing/

Process and catalog photos of The Five Consultants. Maintain archive with proper metadata.

Naming: YYYY-MM-DD_consultant_description_NN.jpg


19. NextCloud Upload Portal for Meg

Time: 30 minutes
Documentation: docs/tasks/nextcloud-upload-portal-for-meg/

Configure NextCloud public upload folder for Meg.


20. "Coming Soon" Video Creation (CapCut)

Time: 2-3 hours
Documentation: docs/tasks/coming-soon-video-creation-capc ut/

Create professional "Coming Soon" video for Firefrost launch using CapCut.


21. Staggered Server Restart System

Time: 2 hours
Documentation: docs/tasks/staggered-server-restart-system/

Automated staggered restarts for game servers. Prevents simultaneous restarts, maintains player access.


22. Game Server Startup Script Audit & Optimization

Time: 1 hour
Documentation: docs/tasks/game-server-startup-script-audit-and-optimization/

Audit and optimize JVM flags, memory allocation, performance tuning for all game servers.


23. LuckPerms MySQL Backend

Time: 45 minutes
Documentation: docs/tasks/luckperms-mysql-backend/

Migrate LuckPerms to MySQL for centralized permission management.


24. World Backup Automation

Time: 1-2 hours
Documentation: docs/tasks/world-backup-automation/

Automated backup system: daily backups, retention policy, off-server storage.


25. Blueprint Extension Installation — Node Usage Status

Time: 30 minutes
Documentation: docs/tasks/blueprint-extension-installation-node-usage-status/

Install Blueprint extension showing TX1/NC1 resource usage in Pterodactyl panel.


26. Discord Server Complete Reorganization

Time: 2-3 hours
Documentation: docs/tasks/discord-server-complete-reorganization/

Complete Discord reorganization: Fire/Frost paths, clear channels, proper roles.


27. Firefrost: The Eternal Skyforge (Flagship Modpack)

Time: 20-40 hours (iterative)
Documentation: docs/tasks/firefrost-the-eternal-skyforge-flagship-modpack/

Flagship Minecraft modpack: Create mod + Fire/Frost theme + weapon forging + factory building.


28. Among Us Weekly Events (Phase 2 Expansion)

Time: Ongoing (30 min weekly prep)
Documentation: docs/tasks/among-us-weekly-events-phase-2-expansion/

Weekly Among Us community events for subscriber engagement.


29. Staff Recruitment Launch

Time: 2-3 hours (setup) + ongoing
Status: PLANNING
Priority: Tier 3 - Content & Community
Documentation: docs/tasks/staff-recruitment-launch/

Launch recruitment for Builders (2-3) and Social Media Helper (1) using recruitment ad.

Prerequisites (Guardian's Notes):

  • Provision incentive instances (private servers for recruits)
  • Define application review process
  • Finalize ad: decide on specific modpacks mention, deadline

Key Deliverables:

  • Incentive instances ready and documented
  • Recruitment ad posted to r/feedthebeast, Discord communities
  • Application tracking system
  • 2-3 Builders + 1 Social Media Helper recruited

Recruitment Ad: docs/planning/discord-recruitment-ad.md

See task directory for: Prerequisites checklist, application process, onboarding guide


📊 QUICK STATS

Total Tasks: 29
Completed: 1 (NC1 cleanup)
In Progress: 2 (Vaultwarden, Terraria Arc, Photo Processing)
Ready to Build: 20+
Blocked: 2 (Mailcow, AI Stack)

Estimated Total Time: ~65-85 hours across all tasks
Critical Path: Frostwall Protocol → Mailcow/AI Stack → Everything else


  • Task Documentation Standard: docs/standards/task-documentation-standard.md (FFG-STD-002)
  • Infrastructure State: docs/core/infrastructure-manifest.md
  • Architecture Decisions: docs/reference/architecture-decisions.md
  • Session Handoff: SESSION-HANDOFF-PROTOCOL.md

Fire + Frost + Foundation = Where Love Builds Legacy 💙🔥❄️


Version History:

  • v3.1 (2026-02-16): Added Task #29 - Staff Recruitment Launch (Guardian's notes)
  • v3.0 (2026-02-16): Full FFG-STD-002 implementation - all 28 tasks migrated to task directories
  • v2.3 (2026-02-16): Whitelist Manager refactored to follow standard
  • v2.2 (2026-02-16): Whitelist Manager expanded to web dashboard
  • v2.1 (2026-02-16): NC1 cleanup marked complete with lessons
  • v2.0 (2026-02-15): Major restructure and organization