Phase 1 of task management consolidation (per Gemini consultation). Added standardized frontmatter with: - status: open | blocked | complete - priority: P1 | P2 | P3 | P4 - owner: Michael | Meg | Holly - created: YYYY-MM-DD Final counts: - 39 open tasks - 17 complete tasks - 1 blocked task Metadata extracted from existing inline markdown and audit results. Ready for Phase 2: 11ty mobile index generation. Chronicler #69
76 lines
1.7 KiB
Markdown
76 lines
1.7 KiB
Markdown
---
|
|
status: open
|
|
priority: P3
|
|
owner: Michael
|
|
created: 2026-01-01
|
|
---
|
|
|
|
# Firefrost: The Eternal Skyforge - Flagship Modpack
|
|
|
|
**Status:** Planning Complete
|
|
**Priority:** Tier 3 - Content Creation
|
|
**Time:** 20-40 hours (iterative development)
|
|
**Last Updated:** 2026-02-17
|
|
|
|
---
|
|
|
|
## Overview
|
|
|
|
Custom Create-focused modpack that embodies the Fire + Frost philosophy through gameplay. Players master weapon forging and factory automation in a skyblock environment.
|
|
|
|
**Theme:** "Where Steel Meets Steam, Legends Are Forged"
|
|
|
|
---
|
|
|
|
## Core Concept
|
|
|
|
- **Setting:** Skyblock world with floating ancient forges
|
|
- **Gameplay:** Automate legendary weapon production using Create
|
|
- **Progression:** 5 weapon tiers from Apprentice to Mythic
|
|
- **Paths:** Fire (competition/combat) vs Frost (engineering/precision)
|
|
|
|
---
|
|
|
|
## Key Features
|
|
|
|
- Create automation as core mechanic
|
|
- Custom weapon crafting system (Tetra or Tinkers)
|
|
- Dual progression paths (Fire competitive, Frost collaborative)
|
|
- Leaderboards and challenges
|
|
- Multiplayer co-op and PvP
|
|
- 3-phase progression (20-40 hours total)
|
|
|
|
---
|
|
|
|
## Documentation
|
|
|
|
**Complete design document:** `design-document.md`
|
|
|
|
Contains:
|
|
- Full gameplay design
|
|
- Mod list and technical specs
|
|
- 3-phase progression system
|
|
- Weapon tiers and crafting
|
|
- Factory templates
|
|
- Quest design
|
|
- Development roadmap (4-5 months)
|
|
- Marketing strategy
|
|
|
|
---
|
|
|
|
## Success Criteria
|
|
|
|
- ✅ Design document complete
|
|
- ⏳ Phase 1: Core setup (2 weeks)
|
|
- ⏳ Phase 2: Recipe development (3 weeks)
|
|
- ⏳ Phase 3: Questing (3 weeks)
|
|
- ⏳ Phase 4: Polish & balance (4 weeks)
|
|
- ⏳ Phase 5: Beta testing (4 weeks)
|
|
- ⏳ Phase 6: Launch
|
|
|
|
**Target:** 10,000+ downloads in 6 months
|
|
|
|
---
|
|
|
|
**Fire + Frost + Foundation = Where Love Builds Legacy** 💙🔥❄️
|